Share

Rio On Bridge Construction

Rio On Bridge Construction

Contributed: The Ministry of Infrastructure Development & Housing informs the general public that as a part of the Caracol Road Upgrading Project, extremely heavy, 100 feet long bridge beams will be transported on the Philip Goldson Highway from Ladyville, along the Burrell Boom Road, George Price Highway, and the Caracol Road to their final destination at the Rio On Bridge, between 18th July and 26th July 2024.

At the Rio On Bridge, motorists may experience delays of up to 2 hours due to the road’s closure while the beams are lifted into their final positions.
The public is advised to be vigilant and exercise extreme caution when approaching and navigating past the heavy equipment transporting these reinforced concrete beams. Drivers are asked to always follow traffic warnings and the instructions of escorts, as these beams may take up the entire width of the highway and the existing Haulover Bridge.
We would like to thank the general public for their kind cooperation in respecting and abiding by these safety precautions and exercising due care and attention when encountering these extraordinary loads on the highway.

Read Also

Village dog bite lands owner on police wanted list
Accident
Arrested
Join our WhatsApp News Channel

Stay connected with Belize Live News for breaking stories, updates, and everything happening in Belize right now.

Trending Now

Village dog bite lands owner on police wanted list
Village dog bite lands owner on police wanted list
Accident
Hit and run at the speed bumps leaves SUV in the drain
Arrested
She held the curtain shut, then ran: man detained in Trial Farm
Cocaine
Island patrol nets drug charge in Boca del Rio

Popular Tags