Share

Hawkesworth bridge set to reopen on November 13

Hawkesworth bridge set to reopen on November 13

By Belize Live News Staff: The Ministry of Infrastructure Development and Housing (MIDH) has announced that the Hawkesworth Bridge, connecting San Ignacio and Santa Elena, will reopen to the public on Wednesday, November 13, 2024, following the completion of rehabilitation works.

A final inspection by the MIDH and contractors will be conducted before the reopening to ensure all works meet safety standards.

The Ministry urges the public to drive cautiously, follow traffic laws, and take pride in maintaining the bridge.

Read Also

images (33)
Screenshot 2026-07-31 073436
Screenshot 2026-07-31 071236
Join our WhatsApp News Channel

Stay connected with Belize Live News for breaking stories, updates, and everything happening in Belize right now.

Trending Now

images (33)
Solar lights stolen from farm recovered, man charged
Screenshot 2026-07-31 073436
Thief slips into unfenced yard, rides off with beach cruiser
Screenshot 2026-07-31 071236
Brazen phone grab at village store parking lot
images (32)
She shielded her babies as he raised the knife

Popular Tags