By Belize Live News Staff: Placencia has the beaches. The lagoon. The reef. The resorts.
What it does not have is a sewer system.
That is about to change.
The Inter-American Development Bank has approved US$17 million, roughly BZ$34 million, to build a sewerage system and a wastewater treatment plant for the Placencia Peninsula.
It has been a long time coming.
For years, the peninsula has grown at speed. More hotels. More houses. More restaurants. More visitors.
And all of it running on septic tanks.
The IDB did not sugarcoat what that is doing.
Its country representative, Karla González, called the septic systems “inadequate” and said the pollutants are “suffocating nearby coral ecosystems.”
Think about that.
The very thing tourists fly in to see is being damaged by what gets flushed.
The fix is a central system. Wastewater gets collected, piped and treated, instead of seeping into the ground and the sea.
Now, the fine print.
Of the US$17 million, US$1 million is a grant.
The other US$16 million is a loan. Belize gets 25 years to repay, with a 5.5 year grace period. Belize also has to put up US$3 million of its own.
So it is not free. It is debt.
But here is the argument for it.
Placencia is one of Belize’s biggest tourism earners. Clean water is the product. Lose that and you lose the visitors, the jobs and the tax dollars with them.
And this is only the beginning.
The loan is the first under a credit line of up to US$160 million aimed at cutting coastal water pollution across Belize.
Placencia goes first. Other coastal communities could follow.
Belize Water Services will also get support to build up its capacity to run the system.
No start date for construction was announced.
But the money is approved.
For a peninsula that has outgrown its plumbing, that is the biggest step yet.


